Farm Shop Tools

Parts Order Comparison Worksheet

Two quotes for one filter rarely tell the whole story. This worksheet puts price, shipping, tax, core charges and delivery time on one landed cost per unit, then adds the cost of waiting.

Why it matters

A low sticker price can hide freight, a restocking fee or a week of downtime. Comparing every line on the same basis shows which supplier really costs less. Fit, specifications and warranty come from the manual and part number, never from price alone.

Step by step

  1. Confirm the exact part number from the machine manual or the old part, and ask each supplier to quote that number or a stated equivalent.
  2. Write quantity, unit price, shipping, handling and tax for each quote, using the same quantity so the lines compare.
  3. Compute landed cost: unit price times quantity, plus shipping and fees, then divide by quantity for landed cost per unit.
  4. Subtract any refundable core or deposit from the cost, noting the return deadline and who pays return freight.
  5. Add a downtime cost for slow delivery: days of delay times what an idle machine costs you per day, using your own figure.
  6. Check return policy and warranty, then choose the lowest total cost that fits the part number and the delivery you need.

Worked example

Illustrative: Supplier A lists 3 filters at $14 each with $12 shipping, so (3 x 14) + 12 = $54, or 54 / 3 = $18 per unit, arriving in 5 days. Supplier B lists $16 each with free shipping, so 3 x 16 = $48, or $16 per unit, arriving in 1 day. B is cheaper by $6 and 4 days faster. If an idle tractor costs an illustrative $200 per day, 4 extra days of waiting adds 4 x 200 = $800 to A.

Printable worksheet: parts quote comparison

  • Part number and machine: ____________________
  • Supplier A: unit price $______ ; quantity ______ ; shipping and fees $______
  • Supplier B: unit price $______ ; quantity ______ ; shipping and fees $______
  • Landed cost per unit = (price x quantity + fees) / quantity: A $______ ; B $______
  • Days to arrive: A ______ ; B ______ ; difference ______ days
  • Downtime cost = extra days x $ per idle day: ______
  • Total cost A ______ ; B ______ ; warranty and return notes: ______

Common mistakes

  • Comparing a unit price from one quote against a delivered price from another.
  • Forgetting that a core deposit is only refunded if the old part is returned on time and in acceptable shape.
  • Valuing downtime at zero, so the slow low-price order always wins on paper.
  • Accepting an equivalent part number without checking dimensions or specifications against the original.

Frequently asked questions

Should I always buy the fastest option?

No. If the machine is idle in winter, a slow cheap order may be right. Put a real value on a day of downtime during the busy season, and the choice usually becomes clear.

Are aftermarket parts as good as the maker parts?

It varies by part and supplier. Check fit, specifications and warranty, and ask your dealer or mechanic. Never substitute a safety-critical part without matching the manual specification.

Where do I find the part number?

Use the parts manual, the number stamped on the old part or the machine serial number with your dealer. When unsure, ask the dealer before you order, since a wrong part costs shipping twice.

Official sources

Educational only. Follow the equipment manual, label or SDS and OSHA rules. State shop resources.